EVALUASI KINERJA INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) SPPG MARGOMULYO SEYEGAN

Detail Karya Ilmiah

EVALUASI KINERJA INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) SPPG MARGOMULYO SEYEGAN

Widodo, Izzati Fikri (2026) EVALUASI KINERJA INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) SPPG MARGOMULYO SEYEGAN. Skripsi thesis, Poltekkes Kemenkes Yogyakarta.

Berkas Karya Ilmiah

PDF
Text (Introduction)
Introduction.pdf
PDF
Text (Abstract)
Abstract.pdf
PDF
Text (Chapter 1)
Chapter 1.pdf
PDF
Text (Chapter 2)
Chappter 2.pdf
PDF
Text (Chapter 3)
Chapter 3.pdf
Restricted to Registered users only
Khusus pengguna terdaftar (perlu login) Ukuran File (2MB)
PDF
Text (Chapter 4)
Chapter 4.pdf
Restricted to Registered users only
Khusus pengguna terdaftar (perlu login) Ukuran File (6MB)
PDF
Text (Conclusion)
Conclusion.pdf
PDF
Text (Reference)
Reference.pdf
PDF
Text (Appedinces)
Appendinces.pdf
Restricted to Registered users only
Khusus pengguna terdaftar (perlu login) Ukuran File (3MB)
PDF
Text
Izzati Fikri Widodo_Full Text.pdf
Restricted to Repository staff only
Khusus staf repository (perlu login) Ukuran File (3MB)
PDF
Text (Naskah Publikasi)
NASKAH PUBLIKASI.pdf
Restricted to Repository staff only
Khusus staf repository (perlu login) Ukuran File (439kB)

Abstract

Background : Wastewater from the SPPG Margomulyo Seyegan kitchen contains high organic matter, oil and grease, detergents, and suspended solids. Fluctuations in flow and pollutant load require optimal performance of each WWTP chamber to ensure the effluent is environmentally safe. However, preliminary measurements show that most units do not meet design criteria: the equalization tank is overloaded with an average OLR of 9.70 kg COD/m³•day (up to 11.76 kg COD/m³•day), while the bioball and honeycomb media tanks have an HRT of only 18.52 hours, far below the 36–48 hour criterion. This condition causes suboptimal biological processes and pollutant accumulation in intermediate stages, so evaluating the chamber units' performance is necessary to identify problematic units and formulate improvements. Objective : To evaluate the chamber units' performance based on HRT, OLR, BOD/COD/TSS removal efficiency, and effluent conformity with quality standards. Methods : A quantitative descriptive study involving direct measurement of tank dimensions and laboratory analysis of inlet and outlet samples from each chamber. Results : Most units do not comply with design criteria. The Equalization Tank experienced overloading (average OLR 9.70 kg COD/m³•day; up to 11.76 kg COD/m³•day), while the Bioball and Honeycomb Media tanks had excessively short HRT (18.52 hours vs. the 36–48 hour criterion). The highest removal efficiency occurred in the Filtration Tank (BOD 98.22%; COD 98.89%; TSS 98.58%). Conclusion: The biological performance of the WWTP is not yet optimal; however, the charcoal filtration unit effectively acts as a final treatment, resulting in effluent quality (BOD 10.45 mg/L; COD 28.0 mg/L; TSS 12.0 mg/L) that complies with Minister of Environment Regulation No. 2760 of 2025. . Keywords : WWTP Evaluation, HRT, OLR, Removal Efficiency, Quality Standards

Informasi Item

Item Type Thesis (Skripsi)
Keywords Keywords : WWTP Evaluation, HRT, OLR, Removal Efficiency, Quality Standards
Subjects T Technology > TD Environmental technology. Sanitary engineering
Divisions Poltekkes Kemenkes Yogyakarta > Jurusan Kesehatan Lingkungan > Program Studi Sarjana Terapan Sanitasi Lingkungan
Date Deposited 17 Nov 2026 07:21
Last Modified 17 Nov 2026 07:21
URI http://eprints.poltekkesjogja.ac.id/id/eprint/24850

Actions (login required)

View Item
View Item
Ada yang bisa kami bantu?